Week 4 — Part Removal & Early Clean-Up Strategy
This week was all about getting the parts off the sprues and setting things up for the clean-up work later on.
I used a two-cut method with two nippers: Bandai’s basic nipper for the first cut, and the DSPIAE ST-A 3.0 single-blade nipper for trimming closer to the part. The Bandai nipper actually performs surprisingly well for its price, and made quick, safe work of removing everything from the runners without putting too much stress on the plastic.
After that, I went back over the parts with the DSPIAE nipper to cut the remaining gate material down as much as possible. On straight edges, this worked really well and often left very little behind. The more awkward areas were the gates placed on rounded or concave surfaces, where a clean flush cut is much harder, so those will need more attention later.
I stopped at that point without doing any knife or sanding clean-up yet. This kit is going to need a fair amount of surface work anyway — not just gate clean-up, but also seam lines and mould parting lines — so it made more sense to leave that for a separate stage.
I haven’t assembled the full kit yet, but from a few random test fits so far, it looks like putting parts together and taking them apart should be fairly easy. If that continues to hold true, then the earlier prep work while the parts were still on the sprues may already be paying off.